11/22/2024 1:10 PM | |
Joined: 3/19/2017 Last visit: 6/18/2025 Posts: 21 Rating:
|
Yes, in fact it is the functioning SCADA PC. It is configures as an NTP server per siemens' instructions: But even if it was unreachable, shouldn't the plc report an issue like the following? "CPU maintenance required: Time synchronization failure: No time synchronization with time master..." |
Last edited by: and.short at: 11/22/2024 13:13:09Last edited by: Moderator_Lan at: 11/22/2024 15:09:14link optimized |
|
Follow us on