(1)| 2/10/2016 9:49 AM | |
|
Joined: 12/28/2015 Last visit: 2/7/2025 Posts: 256 Rating:
|
I think the PerformanceMonitor is the only way for a Gant chart. Here you can build easy formula like downtime and production time. I found this example project 109479384 for WinCC V7.3. The only think is you must take care with the database. |
Last edited by: CastlerTroy at: 2/10/2016 10:25:02 AM |
|
Follow us on