(0)| 4/14/2023 7:12 AM | |
|
Joined: 1/21/2013 Last visit: 1/17/2026 Posts: 4405 Rating:
|
Hi dyno_68, If cyclic communication between two PLCs is required, you may be interested in the Intelligent IO Device functionality. There are other possibilities, but it's hard to suggest the right solution without knowing your requirements. If you read "Difference between synchronous and asynchronous instructions", you will find a different handling of the REQ parameter. The one described is for level-controlled instructions, but there are also edge-controlled instructions such as PUT or GET. Kind regards |
This contribution was helpful to
|
|
Follow us on