(0)| 12/20/2023 2:19 PM | |
|
Joined: 12/8/2023 Last visit: 12/17/2025 Posts: 3 Rating:
|
Hi All, So far I've managed to successfully create my data log, which will now overwrite the first entry after 200 entries. What I'm trying to do now is to have a new log created every day, or after 200 entries. I've made a trigger that activates at midnight every night for this purpose which I've not included in the test program as its not necessary. My problem is I cannot seem to figure out how to create a new log. I've attached an example of the program I'm using. I've removed all the data I'm actually using in the factory and have instead created a counter activated by a switch input just for some data to send to the log.
Let me know if any more info is required. Thanks in advance. 10Eyes. AttachmentLoggingTest.zip (279 Downloads) |
Follow us on