9/16/2025 8:11 PM | |
Joined: 12/18/2014 Last visit: 9/19/2025 Posts: 36017 Rating:
|
The value passed in the DWord (VD) is the total time in minutes. However, you set the block type for Scale Time to "VW," but it must be "VD." |
9/16/2025 9:33 PM | |
Joined: 9/22/2024 Last visit: 9/17/2025 Posts: 4 Rating:
|
So I must chance Message text Time Base Minutes to Hours and LWE Graphics ScaleTime, Block Type VW to VD. |
Last edited by: tsmy at: 09/17/2025 18:12:01Last edited by: tsmy at: 09/17/2025 18:13:00Last edited by: tsmy at: 09/17/2025 18:14:28 |
|
9/17/2025 2:36 AM | |
Joined: 12/18/2014 Last visit: 9/19/2025 Posts: 36017 Rating:
|
I'm sorry but I don't understand what you mean with this .... |
Follow us on