(3)| 7/1/2011 4:23 PM | |
|
Posts: 1 Rating:
|
Hi, I have the same process but I'm a newbie in this area. Could you please help me convert to LAD for this process? Many thanks |
| 7/3/2011 6:42 PM | |
|
Joined: 1/28/2009 Last visit: 1/5/2026 Posts: 6892 Rating:
|
Hi Check the attachment AttachmentHour_cou.zip (579 Downloads) |
| 7/4/2011 6:43 AM | |
|
Posts: 691 Rating:
|
You can use SFC1 for getting the Time Value and use it for Counter Calculation
AttachmentCount.zip (328 Downloads) |
| 7/4/2011 7:14 AM | |
|
Joined: 1/28/2009 Last visit: 1/5/2026 Posts: 6892 Rating:
|
Other solutions are discussed here: altenately start pumps The solution attached done by using SFC1 but the error in measuring time is too much! regards Attachment2nd_sol.zip (305 Downloads) |
| 7/4/2011 8:59 AM | |
|
Posts: 119 Rating:
|
you can use SFB 4 on delay timer for generating delay of 50h to 100h... |
This contribution was helpful to
|
|
Follow us on