(1)| 11/4/2011 2:01 PM | |
|
Joined: 8/18/2009 Last visit: 7/28/2025 Posts: 558 Rating:
|
Dear Expert, In our one redudancy project, last only 2 spare DI is remaining so attached configuration is correct or wrong. AttachmentWiring digram.pdf (402 Downloads) |
Last edited by: RAJKIRAN at: 11/5/2011 6:04 AMRajkiran Patil |
|
Follow us on