(0)| 8/17/2015 2:43 AM | |
|
Posts: 9 Rating:
|
Hi In one my project i am using G 150 1.9 MW drive to control the multi wind motor. plz help me what is the procedure to start the multi winding motor,means in this configuration i have 1 nor cu and 2 line module and two vector module ,so may i want to start two vector motor at a time or one by one , and dc link coupling is mandatory or not plz support me this type of configuration i am doing first time. i am attaching configuration, thank u AttachmentOperating Instructions 1750-2700kW.pdf (235 Downloads) |
Follow us on