(0)| 3/29/2020 7:19 AM | |
|
Posts: 2 Rating:
|
Hello, I am new here and PLC's. I am trying to create a project. When press the push button once Q1 works for 12 seconds and Q2 works at the 5th second and Q2 stops at the 10th second. How can I create this project? I attached the project I was trying to do. I will be glad if you can help. I1 = Stop Button I2 = Start Button
AttachmentSequantial Work.zip (166 Downloads) |
| 3/29/2020 8:10 AM | |
|
Joined: 12/18/2014 Last visit: 1/20/2026 Posts: 36494 Rating:
|
Hello unsalican, at first welcome to the forum. In attachment a example. Try this.... AttachmentSequantial Work_V2.zip (188 Downloads) |
This contribution was helpful to
|
|
Follow us on