(1)| 7/1/2021 3:48 PM | |
|
Joined: 10/11/2006 Last visit: 1/23/2026 Posts: 6074 Rating:
|
Hello, depending on the CU you use, the parameter are described in the list manual. https://support.industry.siemens.com/cs/ww/en/view/109782301 https://support.industry.siemens.com/cs/ww/en/view/109782287 |
|
With best regards, |
|
| 7/2/2021 7:35 PM | |
|
Joined: 1/14/2014 Last visit: 7/9/2025 Posts: 112 Rating:
|
|
| 7/5/2021 11:12 AM | |
|
Joined: 10/11/2006 Last visit: 1/23/2026 Posts: 6074 Rating:
|
Hello, because P627 there is function diagramm 8017 in the list manual. Because motor commissioning: It is described in the manual, it is not necessary to set every parameter manually. https://support.industry.siemens.com/cs/ww/en/view/10978286 5.3 Preparing for commissioning 5.3.1 Collecting motor data 5.3.3 Converter factory setting 5.4 Quick commissioning using the BOP-2 operator panel |
|
With best regards, |
|
Follow us on