9/10/2020 10:13 PM | |
Joined: 9/23/2005 Last visit: 9/10/2025 Posts: 4416 Rating:
|
Hi, In this TIP I post a very simple WinCC Unified Calendar sample example. WinCC Unified Calendar is a WinCC Unified add-on package, that belongs to the Plant Intelligence Options (Delivery release SIMATIC WinCC Unified Plant Intelligence Options V16 https://support.industry.siemens.com/cs/br/en/view/109775492). With Calendar, you create schedules for the production lines and stations of your plant. Downloads:
Documentation: There is very good information on the TIA’s Information System: Working with plant objects and plant views (RT Unified) > Options (RT Unified) > Define time schedules for production lines and stations (RT Unified) Manuals on internet (SIOS):
Requirements:
Configuration steps: Mapping the plant hierarchy of your production line or station in a plant view
Screen edition
In Runtime
Sample project: AttachmentCalendar_20200910_1644.zip (1118 Downloads) |
Last edited by: Denilson Pegaia at: 03/10/2021 19:11:28Denilson Pegaia |
|
This contribution was helpful to
2 thankful Users |
3/13/2024 11:40 PM | |
Joined: 3/13/2024 Last visit: 6/6/2025 Posts: 1 Rating:
|
Hello, i have a question why it doesn't work with 1510SP, i can't browse tag in plant object thanks for your reply Frederic |
Follow us on