5/25/2006 8:14 PM | |
Joined: 1/7/2006 Last visit: 11/17/2023 Posts: 2705 Rating: (318) |
Hi Zhao, There is a spreadsheet where you can calculate the time with. The time is depending of several other things in your system. See Entry ID http://support.automation.siemens.com/WW/view/en/21264953for more information! The FM350-2 can be seen as I/O for the spreadsheet. [;)] |
I hope that the answer will help, if you have still questions, don't hesitate to ask me. |
|
Follow us on