6/21/2019 2:56 PM | |
Joined: 11/15/2017 Last visit: 9/2/2022 Posts: 87 Rating: (0) |
currently toying with a small program that detects a gap in the production process,I am displaying the current total and the previous days total,the small issue I am having is how can I reset current total but still keep previous days total I am trying to move the total from b004 to b008 then reset b004 but still keep b008 total..see attached program ade AttachmentGap_Detection.zip (175 Downloads) |
6/21/2019 3:20 PM | |
Joined: 12/18/2014 Last visit: 10/19/2024 Posts: 33998 Rating: (4227)
|
In attachment a possible solution as an Little example.
AttachmentDaily_reset_FS4.zip (167 Downloads) |
6/21/2019 3:31 PM | |
Joined: 11/15/2017 Last visit: 9/2/2022 Posts: 87 Rating: (0) |
Thank you.....you are most kind |
This contribution was helpful to1 thankful Users |
Follow us on