2/10/2014 2:18 PM | |
Joined: 4/5/2006 Last visit: 8/13/2023 Posts: 642 Rating: (131) |
Hello, what is in BSTACK / USTACK? Regards André Räppel --------------------------------------------------------------------------------- www.raeppel.de
work faster withinnovative PLC-Tools |
2/10/2014 3:17 PM | |
Posts: 23 Rating: (0) |
Block stack.... |
2/10/2014 3:19 PM | |
Posts: 23 Rating: (0) |
FB226, We're assuming that PLC get stuck at instruction 01BC which is half of a DO JU pair. Looking at FB226, we can't work out why it would do that. |
2/10/2014 3:41 PM | |
Joined: 4/5/2006 Last visit: 8/13/2023 Posts: 642 Rating: (131) |
Hello, it looks like an endless loop. Its always in the same block? What is the reason of this: M003: JU = M003 It looks like a jump distributor. Regards André Räppel --------------------------------------------------------------------------------- www.raeppel.de
work faster withinnovative PLC-Tools |
Last edited by: sps-concept at: 2/10/2014 5:09 PMLast edited by: sps-concept at: 2/10/2014 4:00 PMLast edited by: sps-concept at: 2/10/2014 3:54 PM |
|
2/10/2014 5:28 PM | |
Joined: 4/5/2006 Last visit: 8/13/2023 Posts: 642 Rating: (131) |
Hello, maybe in a interrupt-OB? Test it with a unused flagword lower then MW200. Regards André Räppel --------------------------------------------------------------------------------- www.raeppel.de
work faster withinnovative PLC-Tools |
2/10/2014 6:37 PM | |
Joined: 4/5/2006 Last visit: 8/13/2023 Posts: 642 Rating: (131) |
Hello, can you send me your program via mail? You can find it on my homepage. Have you tried it with your test-PLC instead the production-PLC? Regards André Räppel --------------------------------------------------------------------------------- www.raeppel.de
work faster withinnovative PLC-Tools |
Follow us on