5/7/2025 9:25 AM | |
Joined: 8/25/2014 Last visit: 5/12/2025 Posts: 135 Rating:
|
Hello all. I am also stuck with no progress when migrating a WinCC flex runtime project to TIA portal so that we can transfer the runtime to a new computer. The original project is done with Step 7 v 5.5 and Wincc Flexible advanced 2008. We would need to update just the Runtime so that WinCC flexible runtime will run on a new PC that has windows 11. Any tips how to get this migration moving forward. I have TIA portal V17, with migration tools installed. Thanks in advanced. ------------------------------------------------------------------------------------------ |
Last edited by: Moderator_Lan at: 05/07/2025 10:26:31New subject after splitting |
|
5/7/2025 1:40 PM | |
Joined: 7/5/2013 Last visit: 9/11/2025 Posts: 3241 Rating:
|
Hi, didn't get from your post whether the following was already considered (it didn't show if a SP was used for previous WinCC flexible 2008 project):
Regards, Frink |
Pi is exactly three! |
|
5/7/2025 1:55 PM | |
Joined: 8/25/2014 Last visit: 5/12/2025 Posts: 135 Rating:
|
Hello. Thanks will check what version WinCC flex was used last. Regards. |
Follow us on