3/13/2007 5:10 PM | |
Posts: 2 Rating: (0) |
Hello at all, This is my first intervention on this forum. My answer is It is possible mounting logo+eib+asi in the same time? Thank you at all. |
3/14/2007 8:59 AM | |
Joined: 4/24/2006 Last visit: 11/12/2024 Posts: 8768 Rating: (1170) |
Hello ORELEC, When you look in the manual: http://support.automation.siemens.com/WW/view/en/21221909 Chapter 2.1.1 It says that the CM EIB/KNX should be the last module on the right hand side of logo. And the CM AS-Interface is recommended to be the last module on the right hand side of logo. Hope this will help you. Best regards, Wizard |
Follow us on