12/22/2008 3:15 AM | |
Joined: 4/21/2008 Last visit: 3/13/2024 Posts: 12 Rating: (2) |
Hello everyone, when i read the document of "Configuration Limits for Products on the "SIMATIC NET, PC Software, Edition 2007", i don't know the meaning of 'credit 1' and 'credit 2' as the enclosed file describe. Attachmentlimit of CP communication.pdf (235 Downloads) |
Follow us on