(0)| 3/9/2022 12:56 PM | |
|
Joined: 2/6/2015 Last visit: 1/17/2026 Posts: 222 Rating:
|
We want to the same excactly on 840D pl. The triggering over part program is OK. But there should be a way to start the measuring without operator's action. If we could do that we could take automaticaly measures on the machines, what is actualy required by the customer Is there really no way, (Please say yes ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 03/10/2022 11:40:27New subject after splitting |
|
Follow us on