(0)| 2/9/2024 10:47 AM | |
|
Joined: 9/27/2017 Last visit: 1/13/2026 Posts: 22 Rating:
|
Hi all, I am having some issues with a Profibus network (you can check the Post) and I would like to know your recommendations about network earthing. Actually ,as you can see on the attachment, network is a PLC and an OLM connected by a Profibus cable of 1.5 m aprox. Both PLC and OLM Profibus connection have internal connection to ground. Do you thing would be needed a cable earthing approx. in the middle point? Could be this the origin of the intermittent disconnections? Thanks you all in advance for your suggestions |
Last edited by: AutoGen_4612448 at: 02/09/2024 10:49:42 |
|
Follow us on