(0)| 11/28/2012 1:43 PM | |
|
Joined: 10/26/2011 Last visit: 1/13/2026 Posts: 766 Rating:
|
Hello Eli_47, PCS 7 optimzes the processing and cycle sequence very good. But it is a machine. It is better to think about the sequences by your own. Consider also the different OB times. |
|
SIMATIC PCS 7 - Overview |
|
| 11/30/2012 11:35 AM | |
|
Joined: 1/28/2009 Last visit: 1/5/2026 Posts: 6892 Rating:
|
Hello, For controllers in PCS7,There is clue discussed here. Process are classified as slow,medium and fast in reaction.Sampling time can be found via tables or process estimation: Selecting an optimum sampling time of PID controllersBest regards Hamid Hosseini |
| 1/23/2018 7:29 PM | |
|
Posts: 3 Rating:
|
Can we make this type of change while the PLC is running? Will this change take effect without performing another download? Thanks. |