(0)| 9/29/2009 3:46 AM | |
|
Joined: 10/7/2005 Last visit: 1/12/2026 Posts: 3054 Rating:
|
Just a minor correction to J_Bell's advise: Programming and testing (e.g. VAT and Block Status monitoring)are still possible even if "Test, commissioning, routing" is NOT ticked, it will however be asloooower access/update and youwill miss out on routing functionality (which you probably won't need/use, but if you do you must tick the box). Attached is a pdf of the corresponding Step7 inbuilt help for more on this. I hope this helps AttachmentDP Slave Operating Mode HELP.pdf (230 Downloads) |
Last edited by: fritz at: 9/29/2009 3:48 AMAttachment didn''''t upload, 2nd try to attach it. Cheers |
|
This contribution was helpful to
|
|
Follow us on