(1)| 12/28/2009 6:38 PM | |
|
Posts: 1525 Rating:
|
Hi Deepak Here is the link for the OP77B Manual http://support.automation.siemens.com/WW/view/en/21084916 in that Page No.107 you will fid the Project Transfer Procedure & page No. 106 Option for the transfer of a Project for this you required the WinCC Flexible Backup & WinCC Flaxible Software Installed in your PC. if transfer Not started Automaticaly Reboot the OP & Select Transfer option in manu. |
| 12/29/2009 9:13 AM | |
|
Joined: 4/24/2006 Last visit: 1/16/2026 Posts: 9105 Rating:
|
Dear deepak_prolific, Here is a link: how do you do an operating system update (OS update) on operator panels? Best regards, Wizard |
Follow us on