7/16/2014 11:32 AM | |
Joined: 8/25/2005 Last visit: 9/16/2025 Posts: 1162 Rating:
|
Hello PCS 7, which Hardware are you using? Best regards Sabine |
7/16/2014 6:45 PM | |
Posts: 1058 Rating:
|
Hi PCS 7, maybe this manual is helpful for you. see 3.14 regards |
7/19/2014 9:17 AM | |
Joined: 9/2/2013 Last visit: 8/14/2025 Posts: 128 Rating:
|
Hi, I read the manual but still not answered my question. I have attached here a simple setup of our system and I am planning to add a new set of rail at the end of the chain, My proble is how can I do it without interrution or stopping our s7400 H-system CPU? Can somebody help me with a thorough procedure? in this activity can I do it with power on on the bus module? Attachmentarchitecture.pdf (206 Downloads) |
7/19/2014 10:40 AM | |
Joined: 1/28/2009 Last visit: 9/15/2025 Posts: 6875 Rating:
|
Hello, Please check section "17-System modifications during operation " of THIS manual for possible scenarios and procedure in PCS 7/STEP 7.In case of critical process situation(e.g cost/environment), it is recommended to test the procedure in a test set up before final modification.
I hope this helps, Hamid Hosseini |
Last edited by: hdhosseini at: 7/19/2014 10:40 AM |
|
Follow us on