(0)| 4/22/2019 2:34 PM | |
|
Posts: 32 Rating:
|
Hello all, To switch from pcs7 v1.1 sp3 to PCS 7 V9.0 SP1, what should I do? Best reguard ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 4/22/2019 2:38:36 PMNew subject after splitting |
|
| 4/22/2019 2:39 PM | |
|
Posts: 8171 Rating:
|
Closed cause question posted twice. The second thread with the subjectUpgrade PCS7 v7.1 to PCS7 v9.x is published within the conference Process Control Systems SIMATIC PCS 7. Best regards Jen_Moderator |
Follow us on