(0)| 6/21/2019 2:56 PM | |
|
Posts: 87 Rating:
|
currently toying with a small program that detects a gap in the production process,I am displaying the current total and the previous days total,the small issue I am having is how can I reset current total but still keep previous days total I am trying to move the total from b004 to b008 then reset b004 but still keep b008 total..see attached program ade AttachmentGap_Detection.zip (263 Downloads) |
| 6/21/2019 3:20 PM | |
|
Joined: 12/18/2014 Last visit: 1/18/2026 Posts: 36470 Rating:
|
In attachment a possible solution as an Little example.
AttachmentDaily_reset_FS4.zip (262 Downloads) |
| 6/21/2019 3:31 PM | |
|
Posts: 87 Rating:
|
Thank you.....you are most kind |
This contribution was helpful to
|
|
Follow us on