3/9/2012 4:41 PM | |
Posts: 3609 Rating: (29) |
Import of a Technical Question of a User
|
3/9/2012 6:02 PM | |
Joined: 1/28/2009 Last visit: 10/26/2024 Posts: 6852 Rating: (1365)
|
Dear member, Check the attachment for a possible solution and snapshot of my test. Best regards, Hamid Hosseini AttachmentYEAR TRANSITION.zip (428 Downloads) |
Last edited by: hdhosseini at: 3/9/2012 9:01 PM |
|
1/30/2015 10:31 AM | |
Joined: 1/28/2009 Last visit: 10/26/2024 Posts: 6852 Rating: (1365)
|
Hello again, Perhaps it was not a clear way to solve a problem like that with some mysteries but my Date and Time variable starts at the local area byte number 20.See attached file plus consult the online manual of STEP 7 for structure of "Date and Time variable".
NOTE1:If you want to remove BTI instructions, for 50:=(3*16)+2 you should replace W#16#32. I hope thsee rough explanations help, Hamid Hosseini AttachmentDate_and_time.zip (326 Downloads) |
Last edited by: hdhosseini at: 1/30/2015 12:40 PM// attached file added Last edited by: hdhosseini at: 8/22/2015 9:46:11 PM |
|
This contribution was helpful to1 thankful Users |
Follow us on