6/5/2024 12:02 PM | |
Joined: 8/9/2021 Last visit: 6/5/2024 Posts: 1 Rating: (0) |
Hi all, Currently I am struggling with achieving the same goal. I would like to know how I can use a process parameter to manipulate the Allocation Strategy in SIMATIC BATCH. We use late-binding to automatically allocate desired source tank out of a tank farm that meets correct conditions configured by L_UnitStatus. However, if there are more candidates available I would prefer allocating the tank with longest product remain time (based on process parameter). Previously we used the allocation strategy "longest-out-of-use" but this is not sufficient this situation. How can I link something that is programmed in the PLC (e.g. product remain time, highest temperature of highest level) to a Process Parameter in relation with the Unit datatype? Greetings, Yannick ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 06/06/2024 05:02:01New subject after splitting |
|
Follow us on