3/25/2025 4:20 PM | |
Joined: 1/3/2008 Last visit: 4/10/2025 Posts: 9 Rating:
|
Is it possible to replace the control unit PN by a new control unit PB on FSD SINAMICS G120X? Thank you for any hint. |
4/2/2025 11:25 AM | |
Joined: 2/18/2022 Last visit: 4/2/2025 Posts: 12 Rating:
|
Hallo, i had the same question on the siemens support. The Answer from the Support: In contrast to the standard G120, the G120X does not have a modular design and is delivered as a complete inverter including the selected control panel according to the configuration. |
Last edited by: Moderator_Lan at: 04/02/2025 11:35:33Text formatting optimized |
|