5/11/2011 8:50 AM | |
Joined: 11/6/2007 Last visit: 7/5/2021 Posts: 57 Rating:
|
hello , something else, take care that you never divide with a zero!! The PLC wil stop!! greetings from holland |
5/11/2011 1:08 PM | |
Posts: 3 Rating:
|
thanks for your help ........ but as I can see the historical data in a variable and then pass it to a txt or excel format ????? in scl ...... |
5/12/2011 9:11 AM | |
Posts: 316 Rating:
|
In test phase and without SCADA I prefer this methode. @ Lunaticus
You can get write or read the variable with "DB19.base_datos[x]". e.g. DB19.base_datos[1]:=12.0; |
Follow us on