11/29/2023 3:42 PM | |
Joined: 3/28/2010 Last visit: 10/4/2024 Posts: 1058 Rating: (213) |
There are explanations of sequence of operations on start-up, along electrical checks in the factory manual, available here: https://4.imimg.com/data4/JV/KK/MY-2848637/riello-oil-burner-controller-rmo-88-53c2.pdf Attachmentriello-oil-burner-controller-rmo-88-53c2.pdf (314 Downloads) |
Last edited by: Jen_Moderator at: 11/30/2023 08:23:07PDF added from link. |
|
Follow us on