9/24/2009 2:52 PM | |
Posts: 16 Rating:
|
We want to transfer data from 317PN to 317PN. I know this can be done several different methods, of which I can configure already. I added the iMap add on for Step 7 Pro. I created a CBA DB in each CPU, how do I initiate the transfer between CPU's?
AttachmentSample_1.zip (154 Downloads) |
Follow us on