11/15/2006 8:02 AM | |
Posts: 75 Rating: (0) |
That means cyclic hmi jobs and as it is possible to calculate it in WinCC? |
11/15/2006 1:43 PM | |
Posts: 75 Rating: (0) |
How I can calculate a number of cyclic HMI jobs, executedin WinCC? |
11/15/2006 2:04 PM | |
Posts: 75 Rating: (0) |
Update V3.1.3 (6ES7 414-4HJ00-0AB0) Please look to the Link: http://support.automation.siemens.com/WW/view/de/6741018 If the communication load was high and a number of cyclic HMI jobs had to be executed at the same time, loss of synchronization could occur in isolated cases How I can calculate the communication load and a number of cyclic HMI jobs to reduce their value ---- don't loss of synchronization betwen cpu in H system |
Follow us on