3/20/2017 4:28 PM | |
Posts: 1 Rating: (0) |
Dear All I having a problem with my PM 250 where the drive capacity is 55kw and my motor capacity is 22kw, I have tuned in standstill and using it in a overhead crane application. Now I have a problem in Downward movement with load, I am facing F0002 DC link Overvoltage, for Upward movement I have no problem. I choose the drive for regeneration capabilities but now I am in a fix that I cant control it. I am using control unit 240E with 2 wire control. Can anybody help me. Arif Bangladesh ------------------------------------------------------------------------------------------ |
Last edited by: Min_Moderator at: 3/21/2017 2:22:08 PMNew subject after splitting |
|
Follow us on