3/12/2017 3:52 PM | |
Joined: 8/8/2014 Last visit: 9/12/2022 Posts: 34 Rating: (0) |
Dear Jeff Casagrande You mean : Line filter -> PM240 -> Contactor -> Overload relay-> reactor (depend on length of the cable)->motor ? Why we need overload relay while we can config current limit on CU ? About length of the cable within 30m so we can not using reactor right ? Thank you !
|
Last edited by: TienTran at: 3/12/2017 4:08:03 PM |
|
Follow us on