8/27/2018 2:16 PM | |
Posts: 4 Rating:
|
Hi everybody! I am facing the same issues now, except I'm setting up 3 connections. (315F-3 PN/DP V3.2, Simatic 5.6). To clearify, you are running all your instances of FB102 in the same cyclic OB? OB1 I assume? Does Siemens have any example projects of this? I can only find examples for one connection, or multiple connections where only one connection is active at a time. To "save" connections. Thanks :)
------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 8/28/2018 6:17:42 AMNew subject after splitting |
|
Follow us on