8/14/2018 1:32 AM | |
Joined: 9/27/2006 Last visit: 2/13/2025 Posts: 12336 Rating:
|
Hello Mhern; I think you might find this FAQ most interesting: How do you temporarily lock multiple operator panels? https://support.industry.siemens.com/cs/ww/en/view/32967536 It shows how to configure the panels to respond to PLC code to lock up (and come back on) based on a trigger from one panel. In the case described, the trigger comes from accessing a special page on the panels project, In your case, it could be a trigger generated by the Mobile panel to the PLC when it becomes active. Study the PLC code with particular interest, you could reuse it in your own project. Hope this helps, Daniel Chartier |
Last edited by: dchartier at: 8/14/2018 1:43:29 AM |
|
Follow us on