4/20/2015 11:28 AM | |
Joined: 1/21/2013 Last visit: 10/23/2024 Posts: 4620 Rating: (708) |
Hello, As far as I know this is not possible, when you have an OP7 you can only use Protool for transfer a project or follow our Expert Wizard: how to open OP7 program in WinCC felx2008 and How to ... - Siemens
|
Last edited by: Ste39 at: 4/20/2015 11:47:38 AM |
|
4/20/2015 12:56 PM | |
Posts: 24 Rating: (0) |
Nonetheless maybe there is the way to configure OP-7 from WinCC? By set it as OP77, for example.. |
Last edited by: Brusyc at: 4/20/2015 12:58:14 PM |
|
4/20/2015 8:42 PM | |
Posts: 24 Rating: (0) |
Dear Ste39, i will try this option I hope there will no problem with our system administrator. |
Last edited by: Brusyc at: 4/20/2015 8:43:52 PM |
|
Follow us on