7/5/2018 5:40 PM | |
Posts: 29 Rating:
|
In one of the systems our plant, there is a S7-400PLC. In one of its profibus network, there is a sinamics drive after the plc and after that there are 2 ET-200S remote IO system is present. So normally in the plc and in the last ET-200S, profibus switch was in on position and in the drive and in one remote io profibus switch was in off position. Why it happened. Please anyone explain |
Follow us on