7/8/2009 12:44 PM | |
Posts: 293 Rating: (37) |
Maybe this could help you http://www.automation.siemens.com/w2/automation-technology-print-multimedia-7725.htm |
This contribution was helpful to1 thankful Users |
7/8/2009 2:27 PM | |
Posts: 293 Rating: (37) |
Sorr, but i dont know if i understand you. What ist "Drilling Watch"? Is it a PLC? For PCS7 you need a Siemens PLS and PCS7- Software..... |
7/8/2009 11:39 PM | |
Posts: 2661 Rating: (279)
|
The technical term for what you are trying to do is called "migration". There are various migration solutions available from Siemens tailored to suit different customer needs and budgets. In some cases the HMI portion is retained and only the PLCcomponent is replaced. In other casesthe vice versa. Sometimes the existing I/Ois retained to save on re-cabling costs etc. Have a look at the following link to give you a better idea: http://www.automation.siemens.com/w2/automation-technology-simatic-pcs7-migration-4600.htm You have to describe your existing system in detail and what exactly you want to do. Regards |
Last edited by: Phantom75 at: 7/9/2009 4:42 AMLast edited by: Phantom75 at: 7/9/2009 4:40 AM |
|
This contribution was helpful to2 thankful Users |
7/9/2009 7:46 AM | |
Joined: 3/21/2006 Last visit: 11/1/2024 Posts: 10229 Rating: (1181) |
Hello, Also about "Oil and Gas industry" Siemens have PCS7 add-ons. Look for more details about SISOG (Oil and Gas industry) library for PCS7 at http://www.industry.siemens.com/meta/en/products_solutions/product_family_sisog_cis.htm About PCS7 manual - maybe this one Process Control System PCS 7 Tips and Tricks will be helpful in the future. Regards, Hristo Mihalev |
Last edited by: UMENCHO at: 7/9/2009 8:50 AMUseful manual: Process Control System PCS 7 Engineering Compendium 02/2008 Preliminary Draft V2.0 English <div class="quote"><div class="quoteHeader"> wrote:</div><div class="quoteContent"> This manual serves as a design guide, to be used in addition to the SIMATIC PCS 7 product documentation. Essential engineering steps are described in form of operation instructions to a large extent. Based on practical experience, the suggested solution process is meant to cover general essential needs to avoid frequently occurring problems. The compendium is divided into three parts: • Part A Standard • Part B Process Safety • Part C Equipment Modules [\quote] |
|
This contribution was helpful to1 thankful Users |
7/9/2009 10:20 AM | |
Posts: 272 Rating: (4) |
Hi DiDuL Ya, Can u please tell me which controller are u using in the drilling operation?? |
7/10/2009 7:55 AM | |
Posts: 4 Rating: (0) |
SK-2Z11 Drilling watch developed by Shenkai Company is used as a controller for now. |
7/10/2009 8:03 AM | |
Posts: 4 Rating: (0) |
can you also tell me how much programming by the user is involved in the process controlling with PCS7. In which programming languages projects can be created? |
Follow us on