Industry Online Support
Technical Forum
12/22/2008 3:15 AM | |
Joined: 4/21/2008 Last visit: 11/15/2023 Posts: 12 Rating:
|
Hello everyone, when i read the document of "Configuration Limits for Products on the "SIMATIC NET, PC Software, Edition 2007", i don't know the meaning of 'credit 1' and 'credit 2' as the enclosed file describe. Attachmentlimit of CP communication.pdf (123 Downloads) |
Follow us on