(0)| 1/17/2017 4:50 PM | |
|
Posts: 14 Rating:
|
Christoph, Since your the only one responding to my questions, I was hoping you could answer me this question as well if you have the time. I am trying to get a copy of our project that we have on a large automation project. I am hoping to be able to pull the project off the plc. I haven't had much luck getting all the blocks off and hoping what you told me already helps me do that. I was informed that I wouldn't get the hardware config doing it this way, which is not ideal but I should get all the blocks and can piece together where everything is on my own? Will I be able to pull the project off this way? Will I have to go around to all of the small cabinets with s7-300's in them to get each one or if I connect ot the main (2) cabinets of s7-400's, will those come with as well. Just curious what to expect if anything. How else would I be able to get this project off the PLC? Thanks so much ------------------------------------------------------------------------------------------ |
Last edited by: Min_Moderator at: 1/18/2017 11:16:53 AMNew subject after splitting |
|
Follow us on