Industry Online Support
Technical Forum
1/14/2015 7:20 PM | |
Posts: 297 Rating: (41) |
You should be able to use the MMC() command to do this. It is mentioned in the Programming Manual Job Planning, but examples are found in the Commissioning Base Software manual. See https://www.automation.siemens.com/doconweb/pdf/SINUMERIK_SINAMICS_03_2013_E/IHA.pdf?p=468#page=468&view=FitBH,0&pagemode=none HTH, SteveA |
2/9/2015 4:28 PM | |
Joined: 9/3/2014 Last visit: 3/13/2019 Posts: 4766 Rating: (122) |
|
Follow us on