(0)| 11/16/2016 8:52 AM | |
|
Joined: 5/12/2006 Last visit: 11/21/2025 Posts: 22769 Rating:
|
Hi, Confugration Control (Option Handling) mean that you can configure the I/O Modules in the PLC Rack, so that not all projected modules must be present. Here are 2 FAQ's for this functionality: https://support.industry.siemens.com/cs/ww/en/view/29430270 https://support.industry.siemens.com/cs/ww/en/view/109481852 Regards |
This contribution was helpful to
|
|
| 11/16/2016 2:59 PM | |
|
Posts: 25 Rating:
|
Hi, ChristophD, thank you for links. That is exactly what I am trying to do. I will try it again using the prepared library. |
| 11/22/2016 10:39 AM | |
|
Joined: 2/27/2014 Last visit: 8/28/2025 Posts: 689 Rating:
|
Hello, See the attached . AttachmentOption.zip (1138 Downloads) |
|
With Best Regards, |
|
This contribution was helpful to
|
|