11/15/2019 12:57 AM | |
Joined: 9/27/2006 Last visit: 9/25/2024 Posts: 12283 Rating: (2685) |
Hello Ginkoboy; Having world in a des projects si tu Beckhoff controller and displays, i have not seen great advantages to higher acquisition cycles. A SCADA system does not require very high speed to do its most important job, which is to monitor and supervise the process and allow operator intervention. There are acquisition and recording software on the market that are designed for very high-speed data acquisition, such as Iba, if that is a requirement on a project: https://www.iba-ag.com/en/start/ Hope this helps,
|
Follow us on