Industry Online Support
Technical Forum
6/18/2010 8:55 AM | |
Posts: 152 Rating: (2) |
hi is there any step by step procedure , that how single project can be converted into multiproject in PCS7? thanks sun |
6/18/2010 10:27 AM | |
Joined: 4/5/2006 Last visit: 9/16/2024 Posts: 917 Rating: (63) |
Hi sun7, the fastest way is create a project using PCS7 wizard in simatic manager. other basic info are in online manual: - "PCS 7 - Configuration Manual Engineering System" in chapter "Basic concept Engineeering -> Distribuited Engineering" and other link inside the chapter. - "PCS 7 - Getting Started First Steps" here a link to help you ro merge subnet in multiproject Which additionally configuration steps are required if the AS and OS stations are configured in different subprojects within a multiproject? Additional info are in online manual "PCS 7 - PC Configuration and Authorization" that explain how multiproject works and how to use it (benefit and limitation) A pretty nice manual is SIMATIC Process Control System PCS 7 Compendium Part A - Configuration Guidelines hope can help regards |
Last edited by: CBo at: 6/18/2010 10:41 AMLast edited by: CBo at: 6/18/2010 10:31 AM |
|
This contribution was helpful to2 thankful Users |
Follow us on