3/19/2019 1:38 PM | |
Joined: 3/20/2015 Last visit: 9/18/2024 Posts: 61 Rating: (0) |
I know that some time has passed since you wrote this, but I have exactly the same problem. as James Hensley had. But in my case, when the REQ goes from 0 to 1, nothing happens. Done, busy and error are 0, status has the 16#7000 value. What should I do in order to start a job? I have followed this example. Thanks in advance! ------------------------------------------------------------------------------------------ |
Last edited by: jhonuț at: 3/19/2019 1:41:54 PMLast edited by: Jen_Moderator at: 3/19/2019 1:53:35 PMOptimized link. Last edited by: Jen_Moderator at: 3/20/2019 9:50:42 AMNew subject after splitting |
|
3/19/2019 2:20 PM | |
Joined: 3/5/2014 Last visit: 8/5/2022 Posts: 5521 Rating: (1054)
|
hi jhonut, please evaluate the status when Error = true. See this FAQ: How do you evaluate the status of system blocks in STEP 7 (TIA Portal)? hope this helps, regards, |
FCK WAR! |
|
3/19/2019 3:04 PM | |
Joined: 3/20/2015 Last visit: 9/18/2024 Posts: 61 Rating: (0) |
Thanks for your reply, mopS04! I forgot to mention that I'm using Simatic Manager. When REQ signal changes from 0 to 1, I was expecting that my status value would change to 16#7001. "First call with REQ = 0, sending not initiated." is the description of what happens when error is 0 and status has he 16#7000 value. My question is still available. :) |
3/19/2019 3:40 PM | |
Joined: 3/5/2014 Last visit: 8/5/2022 Posts: 5521 Rating: (1054)
|
please show your block-call and the errorevaluation in a screenshot. |
FCK WAR! |
|
Follow us on