10/1/2019 10:28 PM | |
Joined: 10/17/2007 Last visit: 9/17/2024 Posts: 4031 Rating: (353)
|
I really have some experiences on EMCO machine with Siemens 810T, actually I don't think those many "Zero" you mentioned important. You said you re-commissioning the machine with original files. (I thing NC, PLC data and PLC program) I think the only thing you need attention is reference point. even you using original data, but it is possible during down time, mechanical moved , then your X,Z, and tool turret references will be shifted. You can try to use one tool , and making NC programming in G91 to run the machine cutting some plastic (PVC) to try Attachment338_810_820_GA3_Installation_Instructions.pdf (134 Downloads) |
If you like my comments please |
|
Follow us on