12/6/2018 2:45 AM | |
Posts: 8 Rating: (0) |
Dear All, Now I am doing a project with S7-1200 Siemens PLC. I am new in S7-1200 (TIA Portal V15). I want to write a program to run two numbers of pump in alternate with time. firstly pump 1 run , after 1 week pump 1 stop and pump2 will run automatically After pump2 run 1 week, pump 2 stop and pump1 will run . This process will be continuously. Please kindly advise for this.Can I get any sample pgm? Thanks you all. ------------------------------------------------------------------------------------------ |
Last edited by: Jen_Moderator at: 12/6/2018 6:43:39 AMNew subject after splitting |
|
12/6/2018 8:18 AM | |
Joined: 5/6/2010 Last visit: 11/5/2024 Posts: 1988 Rating: (279) |
Hello, you can use a Organization block for the time-of-day interrupt . The OB can have the parameter weekly (call weekly). regards |
Last edited by: Jen_Moderator at: 12/6/2018 10:47:30 AMOptimized link. |
|
Follow us on