5/24/2016 9:21 PM | |
Joined: 9/27/2006 Last visit: 10/17/2024 Posts: 12289 Rating: (2687) |
Hello Gerard; See if the solutions proposed in this discussion can get you started:
Measuring time between 2 events https://support.industry.siemens.com/tf/ww/en/posts/84396/ The following FAQ also examines the use of standard instructions and functions to measure time: How can you measure the time? https://support.industry.siemens.com/cs/ww/en/view/26116927 How accurate does the measurement have to be I your project? Hope this helps, Daniel Chartier |
5/25/2016 9:17 PM | |
Joined: 10/5/2014 Last visit: 8/12/2022 Posts: 243 Rating: (1) |
hello........., in you link,,,,where can i find that "T_EVERZ" or is it not available in s7-300 gr gerard |
5/25/2016 10:04 PM | |
Joined: 9/27/2006 Last visit: 10/17/2024 Posts: 12289 Rating: (2687)
|
Hello Gerard; S_EVERZ is the German mnemonics for what is called in English an On-Delay timer; The English mnemonics for this S5 timer is S_ODT; Have a look at the LAD programming guide for Step 7, and the attachment extracted form the section on timers: https://support.industry.siemens.com/cs/ww/en/view/45523822 Hope this helps, Daniel Chartier |
Last edited by: dchartier at: 5/25/2016 10:05:06 PM |
|
This contribution was helpful to1 thankful Users |
5/26/2016 9:05 PM | |
Joined: 10/5/2014 Last visit: 8/12/2022 Posts: 243 Rating: (1) |
hello poitr is it possible to give an example of this gr gerard |
Follow us on