6/22/2020 12:17 PM | |
Joined: 5/24/2016 Last visit: 5/8/2024 Posts: 315 Rating: (49) |
Hello. As fare as I know there is not an option for this as standard in the controller. But Siemens have made a Application description as to how to implement such an option as a User cycle.
|
Follow us on